GIVING OLD POOLS
A NEW LEASE OF LIFE
With years of experience in pool construction and renovation, Innovez Engineering is well acquainted with the issues that beset ageing pools. Our experience equips us with the technical know-how to solving challenges such as poor water quality, cracked concrete structures, high water usage and poor tile adhesion. The goal in every renovation project is to ensure that the old problems get thoroughly resolved, and the pool gets a facelift with a brand new lease of life.
OPTIMISING YOUR RENOVATION BUDGET
A thorough evaluation of existing maintenance issues, and site assessment of the swimming pool structure, equipment and filtration systems is central to the development of a renovation plan. The detailed assessment will help determine how renovation budgets should be appropriated and where cost savings can be realised. In this way, renovation budgets are optimised for the complete restoration of the facility.
SWIMMING POOL RENOVATION PROCESS
Site evaluation and analysis
Determination of renovation method and develop specifications
Materials testing and selection
Budget development
Programme scheduling
Development of drawings
Submission of samples, materials data and safety documentation
Supply of equipment / material and installation of works on-site
Project management and site supervision
RENEWING OLD POOLS
Innovez Engineering is familiar with swimming pools and the challenges that come with age. This experience has enabled us to be effective at resolving complex pool issues in our renovation projects.
RENOVATING WITH PRE-FABRICATED STAINLESS STEEL
Innovez Pools, a pre-engineered and pre-fabricated stainless steel swimming pool system, provides a more time efficient method for the renovation of an aged swimming pool facility. Pre-fabricated in sections off-site in Singapore, the stainless steel components can be quickly assembled and welded on-site. Where possible, some pools can even be fully welded, pre-plumbed off-site and delivered to site in a single unit. The pre-fabrication work significantly reduces the on-site construction period and shortens the facility’s downtime for the owner.