Project Description

Project Description

Newly rebuilt and completed in second quarter of 2018, The American Club along Scotts Road features new open-air swimming pools. Pre-engineered and pre-fabricated out of stainless steel, both pools were fully installed on-site in less than two months. The pools include the 25-metre long Training Pool, a 10-metre long Teaching Pool and a crescent-shaped Kids Pool that was pre-fabricated, pre-plumbed and lifted onto site in one piece.

Project Details

Architect Aedas
Consultant WSP
Main Contractor Shimizu Corporation
Year Completed 2018

Project Video